Race Track
The team worked fast and furiously earlier this week to lay the radiant tubes for the new floor in the future Niche Modern Glass Studio. Plans are in...
The team worked fast and furiously earlier this week to lay the radiant tubes for the new floor in the future Niche Modern Glass Studio. Plans are in...
What does a clock, a handblown vase, a china pie plate, silk bedding, a couple chairs, a KitchenAid mixer, Bodum French press, cast iron French oven,...
Take a look at this! We're just about ready to pour concrete into the rear section of our future hot shop. Today, we poured the first round of...
This is a great cross section view of the glass studio where heavy machinery is constantly buzzing about. From this perspective you can see the hot...
Across the huge expanse of the future Niche Modern glass studio floor we've been strategically laying a floor drain. Proper drainage is imperative...
The lift has been in use almost non-stop as the guys begin painting the enormously high ceilings of the future Niche Modern glass studio. There is a...
Jeff's crew is almost done prepping for the concrete floors to be poured but now that golf season is officially here Jeff is getting harder and...
The steel mesh arrived last week. Beside reinforcing the concrete, these are used to hold the tubes for the radiant heat system which we're laying...
We found this sketch hanging on the wall when we first walked through the building in 2007. I'm not sure how old it is or who made it. What I am sure...