Our Floors are Sealed: Final Preparations at the New Niche Modern Cold Shop

The floors were sealed last week at the new Niche Modern Cold Shop. I just barely stopped Bruno from running across them and immortalizing his dirty little paws! These are these calm waters just before the first plunge as we get ready now to move our equipment and settle into the new space. Jan, our neighbor at Metconix, fabricated 2 new stainless sinks for us and they look amazing. The space is really coming together!

 

The Cold Shop receives its final changes before work begins

Related Articles

The Very First Load of Cullet Gets Delivered to the Future Niche Modern Glass Studio!

Jeremy did the honors of lining up the forklift and removing our very first load of cullet, which...

Read more

Niche Modern Featured in New Design Sponge Book!

We were so excited when Grace Bonney of the lovely Design Sponge blog told us about her first book...

Read more