Modern Lighting Blog

Painting the Hot Shop

Written by Mary Welch | 5/2/11 11:53 AM

The lift has been in use almost non-stop as the guys begin painting the enormously high ceilings of the future Niche Modern glass studio. There is a stack of metal shelves which are visible in this picture. One day soon we'll assemble them and they'll hold product fresh out of the annealers!